
Ezulwini Underground Mine Project
The following table is a summary of the estimated mineral resource of First Uranium’s Ezulwini Project as set out in the Technical Report – Preliminary Assessment of the Ezulwini Project as revised on May 9, 2007. A copy of the full technical report is available on this website (click on ‘regulatory filings’).(t 000s) |
(g/t) |
(%) |
(oz 000s) |
(lb 000s) |
|
| UE Shaft Pillar | 2,490 | 7.7 | - | 615 | - |
| Middle Elsburg | 2,450 | 4.9 | 0.072 | 384 | 3,888 |
| Total | 4,940 | 6.3 | n/a | 999 | 3,888 |
(t 000s) |
(g/t) |
(%) |
(oz 000s) |
(lb 000s) |
|
| UE Shaft Pillar | 3,640 | 5.8 | - | 683 | - |
| Middle Elsburg | 1,370 | 5.8 | 0.095 | 257 | 2,880 |
| Total | 5,010 | 5.8 | n/a | 940 | 2,880 |
(t 000s) |
(g/t) |
(%) |
(oz 000s) |
(lb 000s) |
|
| UE Shaft Pillar | 6,130 | 6.6 | - | 1,298 | - |
| Middle Elsburg | 3,820 | 5.2 | 0.080 | 641 | 6,768 |
| Total | 9,950 | 6.1 | n/a | 1,939 | 6,768 |
(t 000s) |
(g/t) |
(%) |
(oz 000s) |
(lb 000s) |
|
| Upper Elsburg | 64,550 | 5.8 | - | 12,055 | - |
| Middle Elsburg Channel | 4,810 | 2.3 | - | 351 | - |
| Middle Elsburg | 132,100 | 4.7 | 0.075 | 19,742 | 218,319 |
| Total | 201,460 | 5.0 | n/a | 32,148 | 218,319 |
Notes:
- CIM definitions were followed for mineral resources.
- Mineral resources in the Upper Elsburg shaft pillar are estimated at a 4.0 g/t Au cutoff grade.
- Mineral resources are estimated using an average long-term gold price of US$500 per ounce, and a US$/R exchange rate of 7.0.
- A minimum mining width of 1.53 m was used.
- Rows and columns may not add exactly due to rounding.
- Mineral resources that are not mineral reserves do not have demonstrated economic viability.

